Bug#670271: akonadi-server: Whole day event added in Google calendar takes two days in KOrganizer
Package: akonadi-server
Version: 1.3.1-3+squeeze1
Severity: normal
Creating a whole day event shows up in Korganizer through akanadi as two days.
eg. an all day event on 1.1.13 will show in Korganizer as starting 1.1.3 but with duration 2 days.
I think this relates to this:
http://old.nabble.com/-Bug-252568--New%3A-Whole-day-event-added-in-Google-calendar-takes-two-days-in-KOrganizer-td29820830.html
Is it possible to have a the fix for Debian please?
-- System Information:
Debian Release: 6.0.4
APT prefers stable-updates
APT policy: (500, 'stable-updates'), (500, 'stable')
Architecture: amd64 (x86_64)
Kernel: Linux 3.2.0-0.bpo.2-amd64 (SMP w/2 CPU cores)
Locale: LANG=en_GB.UTF-8, LC_CTYPE=en_GB.UTF-8 (charmap=UTF-8)
Shell: /bin/sh linked to /bin/bash
Versions of packages akonadi-server depends on:
ii libakonadiprivate1 1.3.1-3+squeeze1 libraries for the Akonadi PIM stor
ii libboost-program-opti 1.42.0-4 program options library for C++
ii libc6 2.11.3-3 Embedded GNU C Library: Shared lib
ii libgcc1 1:4.4.5-8 GCC support library
ii libqt4-dbus 4:4.6.3-4+squeeze1 Qt 4 D-Bus module
ii libqt4-sql-mysql 4:4.6.3-4+squeeze1 Qt 4 MySQL database driver
ii libqtcore4 4:4.6.3-4+squeeze1 Qt 4 core module
ii libstdc++6 4.4.5-8 The GNU Standard C++ Library v3
ii mysql-server-core-5.1 5.1.61-0+squeeze1 MySQL database server binaries
akonadi-server recommends no packages.
akonadi-server suggests no packages.
-- no debconf information
Reply to: